CONSORTIUM PROJECTS: – SUDAMERICANA INTEGRAL DE CONSTRUCCIONES S.A. – STIRLING INTERNATIONAL CIVIL ENGINEERING LTDA.

(1992 –  1998)

Works Made

CA-1 – Jícaro-Galán-Choluteca-El Espino road Rehabilitation: Length 110 km and  CA-3 – Choluteca-Guasaule: Length: 44.3 km road Rehabilitation

  • Removal of existing asphalt layer
  • Type 1 granular base completion
  • Reconstruction of the road’s drainage system: Replacement of concrete culverts, reconstruction of entrance and exit channels, construction of new road ditches.
  • Asphalt Primer
  • Laying of new asphalt layer
  • Horizontal Signaling: Lateral and central stripes and reflective studs
  • Vertical Signs: Preventive, regulatory and informative.

Choluteca city Boulevard – Entrance avenue to the city of Choluteca with two lanes each, central parterre, curb and sidewalks

  • Removal and eviction of the existing pavement structure
  • Placement of granular enhancement layers, sub base and base
  • Construction of central parterre, kerbside and sidewalks
  • Construction of the road drainage system: Replacement of concrete culverts, relocation of utilities
  • Asphalt Primer
  • Laying of new asphalt layer
  • Horizontal Signaling: Lateral and central stripes and reflective studs
  • Vertical Signs: Preventive, regulatory and informative.