CONSORTIUM PROJECTS: – SUDAMERICANA INTEGRAL DE CONSTRUCCIONES S.A. – STIRLING INTERNATIONAL CIVIL ENGINEERING LTDA.
(1992 – 1998)
Works Made
CA-1 – Jícaro-Galán-Choluteca-El Espino road Rehabilitation: Length 110 km and CA-3 – Choluteca-Guasaule: Length: 44.3 km road Rehabilitation
- Removal of existing asphalt layer
- Type 1 granular base completion
- Reconstruction of the road’s drainage system: Replacement of concrete culverts, reconstruction of entrance and exit channels, construction of new road ditches.
- Asphalt Primer
- Laying of new asphalt layer
- Horizontal Signaling: Lateral and central stripes and reflective studs
- Vertical Signs: Preventive, regulatory and informative.
Choluteca city Boulevard – Entrance avenue to the city of Choluteca with two lanes each, central parterre, curb and sidewalks
- Removal and eviction of the existing pavement structure
- Placement of granular enhancement layers, sub base and base
- Construction of central parterre, kerbside and sidewalks
- Construction of the road drainage system: Replacement of concrete culverts, relocation of utilities
- Asphalt Primer
- Laying of new asphalt layer
- Horizontal Signaling: Lateral and central stripes and reflective studs
- Vertical Signs: Preventive, regulatory and informative.